The Vine below shows all four sides of the main lobby and shoots up at the two wings, but there is not much to see right now. It is a construction site, and plans are still on track for a grand reopening early in 2014.
From the lobby of Heritage Hall... #USC https://t.co/oyAUPcmh1U
-- USC Trojans (@USC_Athletics) August 16, 2013










